I-25 getting more TLC at two locations north of Wellington

CDOT contractors will be rotomilling and paving bridge decks to maintain safety along two stretches of I-25 north of Wellington.

Work will take place between 7 a.m. and 6 p.m. July 23 and 24 on I-25 at mile marker 298.2 (near the Wyoming state line) and at mile marker 287.5 (Buckeye Exit near Wellington).

Lane closures in both directions of the interstate as well as speed reductions through the work zones. Motorists are encouraged to drive Slow for the Cone Zone!

Be the first to comment

Leave a Reply

Your email address will not be published.


*